How OG&E Increased
Capacity and Strengthened Its Grid for Storms

See how OG&E boosted capacity and improved grid resilience with ACCC® Conductor on a new 138 kV tie line.

Case Study

What’s Inside:

    • How OG&E built a new generation tie line to connect additional power to the grid
    • How line losses were cut by nearly 30%, boosting efficiency and capacity
    • Real resilience: How the ACCC® Conductor helped restore power to 36,000+ customers within days after a direct EF5 tornado strike

How OG&E Boosted Efficiency and Resilience with ACCC® Over a New 138 kV Tie Line

Discover how Oklahoma Gas & Electric strengthened the grid to handle more generation, cut losses, and recover quickly after severe storms.

Get the Case Study