Prysmian – General Cable supplied the ACCC Conductor with E3X coating and Preformed Line Products (PLP) provided ACCC Hardware. Sturgeon Electric used Wagner Smith tensioners, pullers and sheave wheels during the installation. CTC Global’s Master Installer, Ismael Dones, provided on-site training and support. APS, a subsidiary of Pinnacle West Capital, is the largest electric utility in Arizona with 4,000 MW of generating capacity, serving over one million people in 11 counties.
CTC Global Participates at Middle East Energy 2023
CTC Global was glad to be part of Middle East Energy 2023 in Dubai after a successful event in 2022. This year’s event...
0 Comments